theoderich hat geschrieben: ↑So 18. Sep 2022, 12:34 Die DGAM hat ein Factsheet zum Programm SISCAP publiziert. Bis Ende 2023 sollen, auf Basis des Vertrags Consolidación y mejora de las capacidades de los subsistemas SIC EFU y FAL (SISCAP) sieben Demonstratoren SISCAP v2 geliefert werden:
https://www.defensa.gob.es/Galerias/dga ... SISCAP.pdf
Im April wurde die Preliminary Design Review abgeschlossen.
SISCAP R&D project completed

On 7 June, GMV successfully completed the operational demonstration of the Spanish Foot-Soldier System (Sistema Combatiente a Pie: SISCAP) project at the Los Alijares maneuver area, next to the Toledo Infantry Academy.
https://www.gmv.com/en-es/communication ... -completedSISCAP is in the consolidation phase and these tests aimed to demonstrate the capabilities of all the subsystems developed in the previous phase, both in a day and night environment. To this end, the progress made in this phase was tested against previous demonstrations, such as increased system autonomy and improved robustness and maturity. New system capabilities were also demonstrated, namely augmented reality and the integration of remotely piloted autonomous systems (RPAS) such as the Black Hornet.
A battery charger (CBS) was also developed. The CBS not only allows the system to be connected to the VCR8x8 vehicle for data, power, and intercom, but also enables system charging using traditional or alternative energy sources such as solar panels.
GMV has been involved in the SISCAP project since 2017, in a joint venture with Indra. After this operational demonstration, phase 1-b of the SISCAP program will come to an end, giving way to future phases in which the number of prototypes is expected to be increased to include the remaining subsystems.