The BWR-1D and the BWR-1S Reconnaissance Combat Vehicles are floating, armoured, tracked combat vehicles equipped with specialized reconnaissance functions. Their modification was developed and implemented by Wojskowe Zakłady Motoryzacyjne S.A.
The modified vehicles have been retrofitted with technologically advanced systems and devices including:
external communication systems based on Harris and Radmor tactical digital radio stations
IT system with a digital internal communication system,
all-round observation system based on multi-function infrared JIM LR binoculars,
integrated optoelectronic ZIG-T-2R head,
SR Hawk Battlefield Surveillance Radar,
navigation systems (inertial TALIN 5000 and DAGR type GPS) and positioning systems,
SSP-1N OBRA-3 Laser Warning System,
AP4C automatic chemical contamination control device,
Die Erprobung des "Borsuk" wurde abgeschlossen, die Liefertermine sind geklärt und Huta Stalowa Wola soll zur Lieferung der ersten Schützenpanzer bereit sein - nur die Unterzeichnung des Kaufvertrags steht noch aus:
Zuletzt geändert von theoderich am Fr 6. Dez 2024, 17:55, insgesamt 2-mal geändert.
Das polnische Verteidigungsministerium sieht derzeit keine Möglichkeit, den Serienvertrag für den "Borsuk" zu unterzeichnen, obwohl die Finanzierung gesichert ist:
The contract was signed by representatives of the AA, PGZ, and HSW in Warsaw on 27 March in the presence of the Minister of National Defence, Władysław Kosiniak-Kamysz. According to the AA, the contract covers the delivery of the vehicles, a training and logistics package, and the delivery of technical documentation for serial production and acceptance tests.
All 111 Borsuk IFVs are expected to be delivered by the end of 2029. AA spokesperson Lieutenant Colonel Grzegorz Polak told Janes at the event that the first vehicles should be delivered by the end of 2025. This information was confirmed by an HSW representative; however, due to the contract, the exact number of IFVs which are currently being assembled could not be revealed. The HSW facility in Stalowa Wola has been expanded to increase its production capacity. Both hull and turret assembly lines are now capable of delivering Borsuk IFVs, Krab self-propelled howitzers, and Rak self-propelled mortars.
Gestern wurde der Kaufvertrag für die erste Tranche von 111 Schützenpanzern (inkl. Ausbildungs- und Logistikpaket, Dokumentation, Dienstleistungen für die Abnahmeerprobung) im Wert von umgerechnet 1,57 Mrd. EUR unterzeichnet. Lieferung: 2025 - 2029.