Polen: Kampfflugzeugprogramm "Harpia"

Wehrtechnik & Rüstung, Gemeinsame Außen- und Sicherheitspolitik
theoderich
Beiträge: 25276
Registriert: So 29. Apr 2018, 18:13

Re: Polen: Kampfflugzeugprogramm "Harpia"

Beitrag von theoderich »

theoderich hat geschrieben: Do 25. Apr 2024, 06:14 POLAND – ADVANCED ANTI-RADIATION GUIDED MISSILES - EXTENDED RANGE


Zuletzt geändert von theoderich am Mo 19. Mai 2025, 23:28, insgesamt 1-mal geändert.
theoderich
Beiträge: 25276
Registriert: So 29. Apr 2018, 18:13

Re: Polen: Kampfflugzeugprogramm "Harpia"

Beitrag von theoderich »



Poland – AIM-120D Advanced Medium Range Air-to-Air Missiles
The Government of Poland has requested to buy four hundred (400) AIM-120D3 Advanced Medium-Range Air-to-Air Missiles (AMRAAM); sixteen (16) AIM-120D3 AMRAAM guidance sections, including either Selective Availability Anti-Spoofing Modules or M-Code; and one (1) AIM-120 AMRAAM Instrumented Test Vehicle. The following non-MDE items will also be included: AMRAAM control sections, missile containers, and support equipment; Common Munitions Built-in-Test Reprogramming Equipment (CMBRE); ADU-891 adapter group test sets; KGV-135A encryption devices; Computer Program Identification Numbers (CPINs); spares and repair parts, consumables and accessories, and repair and return support; weapons system support and software; classified software delivery and support; classified publications and technical documentation; transportation support; studies and surveys; U.S. Government and contractor engineering, technical, and logistics support services; and other related elements of logistics and program support. The estimated total cost is $1.33 billion.
https://www.dsca.mil/Congressional-Noti ... r-missiles
theoderich
Beiträge: 25276
Registriert: So 29. Apr 2018, 18:13

Re: Polen: Kampfflugzeugprogramm "Harpia"

Beitrag von theoderich »

Poland – GBU-39/B Small Diameter Bombs
The Government of Poland has requested to buy one thousand four hundred (1,400) GBU-39/B Small Diameter Bombs (SDB-I); and four (4) GBU-39 (T-1)/B inert practice bombs with fuzes. The following non-MDE items are also included: GBU-39 tactical training rounds; practice bombs; bomb components; containers; weapons system support; support and test equipment; spare parts, consumables and accessories, and repair and return support; classified and unclassified software delivery and support; classified and unclassified publications and technical data; personnel training and training equipment; warranties; transportation support; site surveys; U.S. Government and contractor engineering, logistics, and technical support services; and other related elements of logistics and program support. The estimated total cost is $180 million.
https://www.dsca.mil/Press-Media/Major- ... eter-bombs

Antworten