Portugal: Beschaffung neuer Fliegerabwehrsysteme

Wehrtechnik & Rüstung, Gemeinsame Außen- und Sicherheitspolitik
Antworten
theoderich
Beiträge: 20024
Registriert: So 29. Apr 2018, 18:13

Portugal: Beschaffung neuer Fliegerabwehrsysteme

Beitrag von theoderich »

Portuguese Army seeks to modernise ground-based air defences
The Portuguese Army expects to receive its first platoon of four vehicle-mounted Very Short Range Air Defence (VSHORAD) systems between 2024 and 2025, Major Ricardo Jorge Parcelas Araújo e Silva, area co-ordinator at the army's Forces Planning Division, told Janes.

A second platoon of four VSHORAD systems is scheduled to be received after 2026.

A request for proposal (RFP) is scheduled to be issued by the NATO Support and Procurement Agency (NSPA) by September, another army source told Janes. Interested competitors will have three months to deliver bids.

A sales agreement between the Portuguese Army and the NSPA in 2017 sought to buy, for EUR32 million (plus EUR9 million added in November 2020), a total of eight systems consisting of eight missile launchers, ammunition, eight 4×4 armoured tactical vehicles or eight 6×6 high-mobility trucks with armoured cabin, and two vehicle-mounted or trailer-mounted short-range 3D local warning radars. Either vehicle type would have mounts for a 7.62 mm and 12.7 mm machine gun, or 40 mm automatic grenade launcher.

The VSHORAD systems are to arm the Anti-Aircraft Artillery Battery of the Mechanized Brigade and the Anti-Aircraft Artillery Battalion of the Intervention Brigade, and will be integrated with the SICCA3 anti-aircraft artillery command-and-control system. Both were equipped with the legacy M48A2E1/A3 Chaparral.

The RFP also includes eight weapon terminals to integrate legacy Stinger manportable air defense systems (MANPADS) with the SICCA3 system.
https://www.janes.com/defence-news/news ... r-defences


Der Regierungsbeschluss dafür stammt aus dem Jahr 2017. Von 2017 bis 2026 sollten bis zu 32 Mio. EUR in acht Terminals für das Sistema Integrado de Comando e Controlo de Artilharia Antiaérea, zwei Radarsysteme kurzer Reichweite und acht leichte Fliegerabwehrlenkwaffensysteme auf leichten gepanzerten Fahrzeugen oder mittleren gepanzerten Fahrzeugen investiert werden:

Governo abre concurso para reequipamento dos sistemas de defesa antiaéreos (5. Juni 2017)

https://www.portugal.gov.pt/pt/gc21/com ... -antiaerea


http://www.exercito.pt/pt/meios/equipam ... poio-fogos


Bild
https://www.facebook.com/ExercitoPortug ... 50/?type=3

Bild
https://www.facebook.com/ExercitoPortug ... 43/?type=3

Bild
https://www.facebook.com/ExercitoPortug ... 93/?type=3

Bild
https://www.facebook.com/ExercitoPortug ... 15/?type=3

Bild
https://www.facebook.com/ExercitoPortug ... 54/?type=3

Bild

Bild
https://www.facebook.com/ExercitoPortug ... 9504999731
theoderich
Beiträge: 20024
Registriert: So 29. Apr 2018, 18:13

Re: Portugal: Beschaffung neuer Fliegerabwehrsysteme

Beitrag von theoderich »

Anti Aircraft Artillery (AAA) System for Portugal

https://eportal.nspa.nato.int/eProcurem ... bw&index=7
  • STATEMENT OF WORK (SOW) FOR THE ACQUISITION OF ANTI-AIRCRAFT ARTILLERY (AAA) SYSTEM FOR THE PORTUGUESE ARMY
    2. BACKGROUND INFORMATION

    The Ministry of Defence (MoD) of Portugal (PRT) and the Portuguese Army currently use the M48 Chaparral system for short and very short-range air defence (SHORAD/VSHORAD) capabilities. The legacy systems are ageing and there is an urgent need to replace them by a new Anti-Aircraft Artillery (AAA) system, capable of meeting the advances in term of technology while also considering new threats, and integrating the other air defence capabilities in service in the PRT Army (Man-Portable Air Defence Systems - MANPADS).
    5. OVERALL SCOPE / MAIN OBJECTIVES

    The AAA system project will be organised in one single phase during which the Contractor will be requested to successfully deliver a “AAA Basic System” (i.e. [Essential] requirements), enhancements (i.e. [Desirable] requirements) and/or optional capabilities (i.e. [Optional] requirements) as follows:

    [...]

    The terminology “AAA Basic System” embeds the technical requirements but also the management, training and documentation requirements for 1 (one) Fire Unit.

    As [Essential] requirement, there shall be one Fire Unit be constituted of:
    • 1 (one) C2C + 3D radar (i.e. the Mobile C2C/3D radar),
    • 3 (three) AAA launchers integrated on a vehicle (i.e. the Mobile AAA launchers) + first batch of missiles,
    • 2 (two) Portable Weapon Terminals (PWTs) for integration of existing MANPADS (i.e. PWTs for MANPADS).
    The Enhanced Capability (EC) packages associated to the AAA Basic System will comprise a set of desirable requirements.

    The Optional Capabilities (OC) will be constituted of single requirements related to specific services or deliverables that could be ordered throughout the duration of the Contract subject to Purchase Order issuance.

    The summary table of each EC and OC is as follows:
    • Enhanced capabilities associated with Mobile AAA launcher performance (EC ML)
      • 1 ea additional Mobile AAA launchers (OC ML#1)
      • 2 ea additional PWTs for MANPADS (OC ML#2)
      • Batch(es) of additional missiles (up to 3 x 8 ea) (OC ML#3)
      • Batch(es) of ammunitions (up to 4 x 8/40/80 ea) (OC ML#4)
    • Enhanced capabilities associated with 3D radar performance (EC R)
    • Enhanced capabilities associated with C2 performance (EC C2)
      • 1 ea additional Mobile C2C/3D radar (OC C2C/3DR)
    • Enhanced capabilities associated with vehicle operational suitability (EC V)
    • Enhanced capabilities associated with logistic support (EC ILS)
      • Follow-on training sessions and documentation (OC ILS#1)
      • Batch of spares for 1 year of support (OC ILS#2)
Antworten