Aktuelle Zeit: 19. Feb 2017, 17:36

Alle Zeiten sind UTC + 1 Stunde




Ein neues Thema erstellen Auf das Thema antworten  [ 8 Beiträge ] 
Autor Nachricht
BeitragVerfasst: 16. Feb 2015, 12:44 

Registriert: 09. Sep 2008, 22:29
Beiträge: 18322
Finland Brushes Off Russian Overtures

Zitat:
The cooling in Finnish interest over Russian military export hardware and systems is also visible in the MoD's advancing $1.2 billion Flotilla 2020 program to procure next-generation multi-purpose warships to replace the Finnish Navy's Hämeenmaa- and Pohjanmaa-class minelayers and Rauma-class missile ships.

No Russian shipyard, including the Finland-based and Russian state-owned Artech, has been invited to bid for naval ship contracts. Located near Helsinki's west harbor, Artech is owned by United Shipbuilding Corporation (USC).

"There has been no talks with Russian shipyards regarding future shipbuilding orders," said Rear Adm. Juha Vauhkonen, chief of staff at Navy Command.

The planned submarine-hunter surface ships, which are due to come into service by 2025, are set to be equipped with helicopter decks and have a torpedo firing and anti-aircraft strike capability.

That USC is included in the United States sanctions against Russian companies hasn't helped the firm's case in being considered a potential supplier of naval ships under the Flotilla 2020 program, said Jussi Niinistö, Parliamentary Defense Committee chairman.

"Under existing procurement rules, certain companies can be ignored on grounds of national security when it comes to defense acquisitions," Niinistö said in an interview.

USC acquired 100 percent of Arctech's shares when it bought out the South Korean-owned STX Finland (Europe) Inc.'s 50 percent interest in the shipyard in December.



Agreement between the Ministry of Defence of the Republic of Finland acting on behalf of the Government of the Republic of Finland and the Federal Ministry of Defence of the Federal Republic of Germany and the Department of Defense of the United States of America concerning Surface Combatant Aluminium Structure Design

Zitat:
Suomen osalta hanke on osa monitoimialus 2020 tutkimusohjelmaa, jonka merivoimat on käynnistänyt vuonna 2009. Tutkimusohjelman tavoitteena on kehittää valmiudet hankkia kustannustehokas ja monikäyttöinen 2020-luvun taistelualus. Tutkimusohjelmassa selvitetään muun muassa monitoimialuksen aluskokoon, rakenteisiin ja taistelukestävyyteen liittyviä kysymyksiä. Monitoimialus 2020 (MTA2020) on sisällytetty merivoimien vuosien 2009 - 2020 meripuolustuksen kehittämisohjelmaan. Monitoimialus 2020 on monikäyttöinen alusluokka, joka suunnitellaan torjumaan perinteisiä ja asymmetrisiä uhkia avomerellä ja rannikon läheisyydessä Itämerellä. Lisäksi aluksella voi osallistua kansainvälisiin kriisinhallintaoperaatioihin. Uudella alusluokalla korvataan Hämeenmaa -luokan miinalaivojen, miinalaiva Pohjanmaan ja Rauma-luokan ohjusveneiden poistumisen myötä katoavaa suorituskykyä.


In Finland, the project ist part of the Multi-Purpose Vessel 2020 research program, which the Navy has launched in 2009. The aim of the research program is to develop the skills for a cost-effective and versatile warship of the 2020s. The research on the multi-purpose vessel includes identifying the size of the vessel, the structures and battle sustainability issues. Multi-Purpose Vessel 2020 (MTA2020) is included in the Navy's sea defence research program for the years 2009 - 2020. The Multi-Purpose Vessel 2020 is a multi-purpose vessel class, which is designed to fight conventional and asymetric threats on the open sea and off the coasts of the Baltic Sea. Additionally it may participate in international crisis management. The new ship class replaces the Hämeenmaa-class minelayer, the Pohjanmaa-minelayer and the Rauma-class missile boats, because of their declining performance.



Bild

Bild


Nach oben
 Profil  
Mit Zitat antworten  
BeitragVerfasst: 05. Sep 2015, 09:18 

Registriert: 09. Sep 2008, 22:29
Beiträge: 18322
‘Growler’ edition is next plan for Gripen, says senior SAAB exec (September 2015)

Zitat:
DIQ: Another aspect to consider…In the light of recent Russian activity, we hear a lot about increasing and deepened cooperation between the Nordic countries. What are SAAB’s feelings in that respect?

    Lennart Sindahl: You’re right. Many in our region had hoped for a different development around our regional security architecture. Subsequently, there is now a constant increase in security cooperation among Scandinavian nations, but in particular between Sweden and Finland. The Finnish Navy now has a new requirement for new multi-purpose corvettes. They call the concept ‘MTA-2020’. We have now started to look into this in detail because if Sweden and Finland could agree to the same configuration, this could emerge as a large class of corvettes.

DIQ: Maybe looking a bit like the legendary Visby series of ‘stealth’-corvettes?

    LS: Yeah, it could be a further development of the Visby concept, but of course involving the Finnish shipbuilding industry and suppliers, like Patria. We’ve already cooperated with them on 8x8 APCs for Australia. We supplied the C2 system and they supplied the vehicles.



Nach oben
 Profil  
Mit Zitat antworten  
BeitragVerfasst: 05. Okt 2015, 14:44 

Registriert: 09. Sep 2008, 22:29
Beiträge: 18322
Puolustusministeri valtuutti puolustusvoimat käynnistämään Laivue 2020 -hankkeen



Finland begins Squadron 2020 OPV programme

Bild

Zitat:
Finland has begun its 'Laivue 2020' (Squadron 2020) programme to build a new class of four multipurpose offshore patrol vessels (OPVs).

The new vessels are intended to replace the Finnish Navy's four Rauma-class fast-attack missile boats, and its two Hämeenmaa-class minelayers. Both of these classes are planned to be retired in the mid-2020s, as their service life "cannot be extended in a cost-efficient way", according to the Finnish Ministry of Defence (MoD).

Speaking to IHS Jane's on 1 October, a spokesperson for the MoD stated, "The exact timing of the different milestones will be determined in the course of the programme, but as the first stage, an RFI [request for information] is foreseen to be issued in 2015-2016. Construction of the ships is foreseen in the years 2019-2024."

Zitat:
The MoD estimates that building the new vessels will cost EUR1.2 billion (USD1.34 billion).



Nach oben
 Profil  
Mit Zitat antworten  
BeitragVerfasst: 21. Dez 2015, 06:00 

Registriert: 09. Sep 2008, 22:29
Beiträge: 18322
Request for Information for the Finnish Navy fighting ships construction project

Zitat:
Finnish Minister of Defence, Jussi Niinistö, has given the Defence Forces a mandate to start the Finnish Navy project, Squadron 2020. The aim of the Squadron 2020 project is to construct four new corvette-size fighting ships for year-round operation in the special weather and ice conditions at the Baltic Sea. The Request for Information informs shipyards about the project and inquires know-how and price information from shipbuilders and suppliers to base the Request for Quote on. The RFI was sent out on 18 December 2015 and answers are requested by the end of March next year.

The four new vessels will replace the already decommissioned FNS Pohjanmaa, four Rauma-class fast attack missile craft and two Hämeenmaa-class minelayers that will reach the end of their life-cycle by the mid-2020s.

Zitat:
Central criteria for selecting the constructor are the Finnish Navy's strict requirements for the ships performance in winter conditions and naval mine-laying capability. Foreign military shipyards are not able to provide standard plans for ships suitable for Finland's needs and conditions. Maintenance, service and repairs are of critical importance for the vessels' performance and need to be mainly available in Finland. The new vessel class project is estimated to require a funding of €1.2bn, and the life-cycle of the vessels will be at least 35 years.

The public parts of the Request for Information, prepared by the Defence Forces Logistics Command, will be sent to companies, who may have know-how and systems relevant for the project. The companies may put in a tender for the complete project or some part of it, for example for weapon and censor systems. Complementary, classified materials will be provided at a seminar to be held later on.

Procurement decisions will be made in the course of next year. Upon completion of the contract negotiations, the contracts will be signed in 2019. The first naval engineering tests are scheduled for 2020 and according to plan the last ship should be handed over to the Finnish Defence Forces in 2024.



Nach oben
 Profil  
Mit Zitat antworten  
BeitragVerfasst: 11. Mär 2016, 15:09 

Registriert: 09. Sep 2008, 22:29
Beiträge: 18322
Merivoimien taistelualushanke Laivue 2020



Nach oben
 Profil  
Mit Zitat antworten  
BeitragVerfasst: 24. Sep 2016, 10:36 

Registriert: 09. Sep 2008, 22:29
Beiträge: 18322
Puolustusvoimat ja Rauma Marine Constructions Oy solmivat aiesopimuksen (14. September 2016)

The Finnish Defence Forces and Rauma Marine Constructions Oy signed a letter of intent

Zitat:
Puolustusvoimat selvittää mahdollisuudet hankkia Laivue 2020 -alukset suomalaiselta Rauma Marine Constructions Oy -telakkayritykseltä. Alusten taistelujärjestelmä puolestaan kilpailutetaan kokonaistoimituksena. Taistelujärjestelmä koostuu taistelunjohtojärjestelmästä, sensoreista ja aseista. Taistelujärjestelmätoimittajien kilpailutus käynnistetään tämän vuoden aikana. Laivue 2020 saavuttaa täyden operatiivisen valmiuden vuosina 2026 - 27.

Puolustusministeri valtuutti 23.9.2015 Puolustusvoimat käynnistämään Laivue 2020 -hankkeen. Päätöksen mukaan Merivoimien suorituskyvyn edellyttämän huolto-, ylläpito- ja vauriokorjauskyvyn varmistamiseksi hankittavaa järjestelmää koskevien palveluiden on oltava kriittisiltä osiltaan saatavissa Suomesta.


The Finnish Armed Forces are looking to acquire the Laivue 2020 vessels from the Finnish shipyard Rauma Marine Constructions Oy. In turn the vessel's combat system will be awarded in competitive bidding.

The combat system is composed of the battle management system, sensors and weapons. The competition of the combat system suppliers will be launched this year. Laivue 2020 will reach its full operational capability in 2026-27.

On 23rd September 2015 the Minister of Defence authorized the Armed Forces to launch the Laivue 2020 project. According to the decision the Navy is going to perform service, maintenance and the ability to repair damages in order to ensure, that the critical system services must be entirely available from Finland.


Zitat:
Laivue 2020:n tietopyyntöön saatiin yli 80 vastausta kotimaisilta ja ulkomaisilta toimittajilta. Puolustusvoimien logistiikkalaitos ryhtyy selvittämään Rauma Marine Constructions (RMC) Oy:n mahdollisuuksia toimia alusten rakentajana. Tämän vuoksi logistiikkalaitos on solminut RMC Oy:n kanssa aiesopimuksen, joka mahdollistaa yrityksen telakkakapasiteetin, huoltovarmuuden edellytysten ja sotalaivojen muiden rakentamisedellytysten selvittämisen.

Puolustusvoimien logistiikkalaitos on käyttänyt apunaan hankintamallivaihtoehtojen ja RMC Oy:n suorituskyvyn alustavassa arvioinnissa riippumatonta asiantuntijayritystä. Merivoimien ja Puolustusvoimien logistiikkalaitoksen useilla tutkimushankkeilla, simuloinneilla ja mallikokeilla on luotu edellytykset taistelualuksen tekniselle määrittelylle ja kotimaiselle suunnittelulle vastaamaan kansallisia erityisvaatimuksia.




Nach oben
 Profil  
Mit Zitat antworten  
BeitragVerfasst: 19. Dez 2016, 16:29 

Registriert: 09. Sep 2008, 22:29
Beiträge: 18322
The Finnish Defence Forces' Logistics Command requests delivery of the battle system for the Squadron 2020 vessels

Zitat:
The Finnish Defence Forces' Logistics Command will send requests to 12 domestic and foreign companies to participate in tendering for a battle system for the Squadron 2020 vessels. Replies are expected by 13.2.2017. After this date an invitation to negotiate and an invitation to tender will be sent to selected suppliers during spring. The battle system will be competitively tendered; this will include the integration of systems into the vessels. The battle system will consist of weapon systems, command and control systems and sensor systems.

The first phase of the call for tender is started by a request to participate; this contains the criteria for participation. After analysing the replies, potential tenderers are selected to participate in the negotiation. An invitation to negotiate and a preliminary invitation to tender will be sent to the selected tenderers.

The first round of negotiations will be conducted in the course of 2017 and the deadline to submit a preliminary tender is in autumn 2017. The second round of negotiations will be started already at the end of 2017 and it will be continued in winter 2018. The final round of tenders and the signing of the agreement will take place during 2018.

The Defence Forces are evaluating the possibility to purchase Squadron 2020 vessels from the shipyard of Rauma Marine Constructions. A statement of intent was agreed with the shipyard through which the company's shipyard capacity, security of supply and other preconditions to build surface combatants can be assessed.

Zitat:
The exact configuration of the battle system will be decided in the course of design but at least sea mines and missiles are likely to be included in the main weapon systems. The plan is to construct four vessels which will be capable of navigating through ice-covered waters. As to the Navy's current surface combatants, the life-cycle of four Rauma-class fast attack missile crafts and two Hämeenlinna-class minelayers will end by mid-2020s. Their life-cycle cannot be extended in a cost-efficient way.


Bild

Bild

Bild


Nach oben
 Profil  
Mit Zitat antworten  
BeitragVerfasst: 17. Feb 2017, 17:05 

Registriert: 09. Sep 2008, 22:29
Beiträge: 18322
Das finnische Verteidigungsministerium hat heute eine umfangreiche Informationsbroschüre für das Rüstungsprojekt "Laivue 2020" veröffentlicht:



Nach oben
 Profil  
Mit Zitat antworten  
Beiträge der letzten Zeit anzeigen:  Sortiere nach  
Ein neues Thema erstellen Auf das Thema antworten  [ 8 Beiträge ] 

Alle Zeiten sind UTC + 1 Stunde


Wer ist online?

Mitglieder in diesem Forum: 0 Mitglieder und 2 Gäste


Du darfst keine neuen Themen in diesem Forum erstellen.
Du darfst keine Antworten zu Themen in diesem Forum erstellen.
Du darfst deine Beiträge in diesem Forum nicht ändern.
Du darfst deine Beiträge in diesem Forum nicht löschen.

Suche nach:
Gehe zu:  


Link zu Doppeladler.com
Link zu The Modeller
Link zu den Freunden Historischer Schiffe
Doppeladler.com - Plattform für Österreichs Militärgeschichte
The Modeller - Österreichs Militärgeschichte durch die Modellbaubrille
FHS - Die Freunde Historischer Schiffe
Powered by phpBB® Forum Software © phpBB Group
Deutsche Übersetzung durch phpBB.de