Hinweis: Sie befinden sich im Archiv des alten Forums von DOPPELADLER.COM. Dieses Forum wird nicht länger betrieben. Es ist nur mehr Lesezugriff möglich.
Sie erreichen das DOPPELADLER.COM FORUM nun unter ...

https://www.doppeladler.com/da/forum/index.php



Neue Mannschaftstransportpanzer für Dänemark

Wehrtechnik & Rüstung, Gemeinsame Außen- und Sicherheitspolitik
theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Neue Mannschaftstransportpanzer für Dänemark

Beitrag von theoderich » 16. Mär 2016, 15:18

Denmark-Ballerup: Mortars

2016/S 053-088832

Contract notice

Supplies


II.1.5) Short description of the contract or purchase(s):

This tender concerns the acquisition of 15 autonomous floor mounted Heavy Mortar Systems (120mm Mortar Systems). The acquisition also includes a fire control system, ammunition racks and the necessary technical support to integrate the weapon system on the platform (Piranha 5 from MOWAG). The integration of the Mortar System (and the ammunition racks) is handled by MOWAG, and MOWAG has the overall responsibility for the integration, but the provider of the Mortar System must participate in the integration on the platform in cooperation with MOWAG and relevant parts of the Danish Defence.

Besides the planned acquisition of 15 Mortar Systems the Acquitsion Contract have an option for DALO to acquire up to additionel 6 Mortar Systems. DALO is not obliged to make use of the option as well as DALO is not obliged to acquire all of the Mortar Systems included in the option. The exact mechanism for DALO use of the options will be described in the Acquisition Contract.

As described the Mortar Systems is to be mounted and integrated on/in the Danish Defence new armoured personnel carrier (Piranha 5) (the mortar variant). The weapon system must be physically dimensioned to fit within the body/hull of the platform, as well as it must leave sufficient and proper room for the crew (95 percentile soldier in accordance with MIL-STD-1472 G or equivalent). The exact dimensions will be described in the Acquisition Contract.

DALO value the safety of the crew, which means that features that enhance work safety and reduce the wear and tear on the crew will be given special attention. Furthermore attention will be given to solutions that enhance the crew's survivability on the battlefield, i.e. protective measures, reduced exposure to the battlefield elements, storage of ammunition that prevent excessive or sympathetic reaction to blast or direct attacks and so forth. The exact requirements will be described in the Acquisition Contract.

The Mortar Systems must be capable of operating in a wide range of climatic environments. The Mortar Systems must be capable of operation on a fragmented battlefield as well in a conventional war scenario. This means that the Mortar Systems must be capable of operation autonomously as a single platform in a decentralized manner, or in pairs or groups in a centralized manner.

The Mortar System and the affiliated fire control system must be able to be an integrated part of the Danish Army command, control and battle management system and its fire coordination module — including the physical extremities as radios, command screens etc. Furthermore the Mortar System must be able to fire the legacy M/50 High Explosive mortar bomb in stock. The exact requirements will be described in the Acquisition Contract.

The Mortar System must have a firing range of minimum 7 kilometres with conventional and un-assisted High Explosive (HE) ammunition. Furthermore the Mortar System must be capable of firing 360°.

The Mortar Systems shall as a minimum be factory acceptance tested prior to delivery and site acceptance tested after delivery and the integration into the platform. The exact requirements for testing and acceptance test procedures will be described in detail in the Acquisition Contract.

In addition to the delivery of the Mortars Systems, the Acquistion Contract includes among other delivery of an initial stock of spare parts of each Mortar Systems.

It is of paramount importance that DALO will be able to purchase relevant spare parts to the Mortar Systems as well as having the possibility to receive technical advice and repair assistance in case a technical problem cannot be solved by DALO. Therefore DALO will in connection with the Acquisition Contract enter into a Sustainment Agreement (duration of 30 years) in order to ensure sustained operation of the Mortar Systems. The Sustainment Contract encompasses core service and non-core services as well as the possibility for DALO to purchase supplies (spare parts, special tools etc.) for a duration of the Sustainment Contract. Core services shall be provided automatically as long as the contract is in force, while non-core services and supplies will be contracted by DALO on a case by case basis.

The supplier is obligated to maintain a service organisation capable of providing support to the Mortar Systems when operating in international operations. The exact terms of this obligation is described in detail in the Contracts.

The purchaser is using Mercell Sourcing Services for this tender. To notify your interest and get access to any documents, you must copy and paste the link below into the address-part on your browser.

http://permalink.mercell.com/57313626.aspx

II.2.1) Total quantity or scope:

15 Mortar Systems (including spare parts) and a Sustainment Agreement regarding relevant spare parts and technical advice and repair assistance to the Mortar Systems. In addition also an option for 6 Mortar Systems (including spare parts), cf. II2.2).

II.2.2) Information about options

    Options: yes

    Description of these options: DALO can acquire up to 6 additional Mortar Systems (including spare parts). DALO is not obliged to make use of the option as well as DALO is not obliged to acquire all of the Mortar Systems included in the option.

    Provisional timetable for recourse to these options:

      in months: 120 (from the award of the contract)


Lösungen wie AMOS oder NEMO sind damit von vornherein ausgeschlossen. Es sind Systeme dieser Art gefragt, wie sie u.a. schon von der Schweiz bestellt worden sind:


theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Neue Mannschaftstransportpanzer für Dänemark

Beitrag von theoderich » 27. Apr 2016, 13:28

Denmark-Ballerup: Surveillance and security systems and devices

2016/S 082-145835

Prior information notice for contracts in the field of defence and security

Supplies


II.4) Short description of nature and scope of works or nature and quantity or value of supplies or services:

The Danish Defence Acquisition and Logistics Organization (hereinafter referred to as DALO) plans to invite tenders for a Framework Agreement regarding acquisition of a shot detection system. By a shot detection system DALO understands a system which is mounted on a vehicle and primarily will be able to warn the crew when a supersonic round is passing the vehicle. The system should furthermore be able to recognize other sources of sound and inform the crew.

The contract notice is expected to be published within the forthcoming months. Due to an anticipated tight time schedule the purpose of this prior notice is to give the market expected time indications of the process in order to give potential contractors the best possible opportunity to prepare for a future tender.

It shall be stressed that all information provided in this prior notice is solely expectations and intentions and DALO cannot be held liable for any changes.

At this early stage in the process DALO is anticipating the following time-frame:

    2016 Q2-Q3: Expected publication of contract notice and pre-qualification.

    2016 August: Bidders conference.

    2016 September: Test.

    2016 Q3-Q4: Evaluation of incoming bids.

    2016 Q4 — 2017 Q1: Signing a Framework Agreement.

    2017: Delivery of equipment and services.

A test is expected to be conducted in Denmark. Pre-qualified candidates are currently expected to be able to make 3 systems available for test purpose.

DALO emphasizes that this prior notice is not a call for tender but is solely to provide the market with expected time indications for a possible future tender. Potential contractors are kindly made aware that aside from the information given in this notice no further information regarding the tender material, documents, conditions or the tender procedure is available prior to the publication of a contract notice. It shall furthermore be stressed that DALO reserves the rights to make changes regarding all information provided without further notice on TED.



Bild

Bild

Bild

Bild



theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Neue Mannschaftstransportpanzer für Dänemark

Beitrag von theoderich » 03. Mai 2016, 23:07

Denmark-Ballerup: Surveillance and security systems and devices

2016/S 086-152416

Prior information notice for contracts in the field of defence and security


II.4) Short description of nature and scope of works or nature and quantity or value of supplies or services:

The Danish Defence Acquisition and Logistics Organization (hereinafter referred to as DALO) plans to invite tenders for a Framework Agreement regarding acquisition of a Laser Warning System. By a Laser Warning System DALO currently understands a system which is mounted on a vehicle and will be able to warn the crew when an active laser is directed at the vehicle. The system should detect if an active laser is pointing at the vehicle and be able to determine from which direction the laser is pointing.

A contract notice is expected to be published within the forthcoming months. Due to an anticipated tight time schedule the purpose of this prior notice is to give the market expected time indications of the process in order to give potential contractors the best possible opportunity to prepare for a future tender.

It shall be stressed that all information provided in this prior notice is solely expectations and intentions and DALO cannot be held liable for any changes.

At this early stage in the process DALO is anticipating the following time frame:

    2016 Q2-Q3: Expected publication of contract notice and prequalification

    2016 August: Bidders conference.

    2016 September: Test

    2016 Q3-Q4: Evaluation of incoming bids

    2016 Q4 — 2017 Q1: Signing a Framework Agreement

    2017: Delivery of equipment and services.

A test is expected to be conducted in Denmark. Prequalified candidates are currently expected to be able to make three systems available for test purpose.

DALO emphasizes that this prior notice is not a call for tender but is solely to provide the market with expected time indications for a possible future tender. Potential contractors are kindly made aware that aside from the information given in this notice no further information regarding the tender material, documents, conditions or the tender procedure is available prior to the publication of a contract notice. It shall furthermore be stressed that DALO reserves the rights to make changes regarding all information provided without further notice on TED.




Laser Warning Detector: LWD

Bild


LEDS-50

Bild


RALM02 Laser Warning Receiver

Bild


LIRD-4B

Bild


Bild


SSP-1 OBRA-3 Laser warning system

Bild


SOL-1



Threat Detection Systems



TLUS - Laser Warning Receiver System

Bild


Warning Systems



Bild

theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Neue Mannschaftstransportpanzer für Dänemark

Beitrag von theoderich » 22. Jul 2016, 22:18

Denmark-Ballerup: Military vehicles and associated parts

2016/S 140-253659

Contract award notice for contracts in the field of defence and security

Supplies


II.1.4) Short description of the contract or purchase(s):

Danish Defence Acquisition and Logistics Organization ( DALO) wishes to procure a vehicle camera system for Drivers vision and Local situational awareness. The system is primarily a drivers system, but should also be able to provide some situational awareness and assist in using tools (dozer blade, excavator etc.) on the vehicle. In order to reduce time spend on training and education, and reducing logistic footprint, there is a requirement for a system, which can be used on all types of vehicles in the Danish Defence forces and which is scalable to various vehicles, situations and requirements.

V.1) Date of contract award decision:

    6.6.2016

V.2) Information about offers

    Number of offers received: 2

V.3) Name and address of economic operator in favour of whom the contract award decision has been taken

    Selex ES Ltd
    Sigma House, Christopher Martin Road, Basildon
    SS14 3EL Essex

Zuletzt geändert von theoderich am 08. Sep 2016, 11:52, insgesamt 1-mal geändert.

theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Neue Mannschaftstransportpanzer für Dänemark

Beitrag von theoderich » 08. Sep 2016, 11:45

Leonardo to Provide Vehicle Mission Systems for Danish Army

Bild

Leonardo-Finmeccanica has signed a contract with the Danish Defence Acquisition and Logistics Organisation (DALO) to provide Vehicle Mission Systems for the Danish Army’s land vehicles.

Based on the Leonardo solution, developed to be fully compliant to the very latest Generic Vehicle Architecture (GVA) technology, the systems will be fitted on several platforms including the newly procured General Dynamics European Land Systems (GDELS) PIRANHA V APC, new Armoured Patrol Vehicles, FFG WISENT engineering vehicles, LEOPARD II MBTs, and CV90 IFVs.

The first production order under the framework contract is expected imminently. Leonardo was selected as the chosen supplier after two competitive user field trials and comprehensive through-life cost and supportability analyses. Modular mission systems will be tailored to each vehicle type and role, with DALO able to select the mix of rugged imaging sensors best suited to the job (up to full 360° colour and thermal imaging coverage), while benefitting from the lower maintenance costs and ease of training inherent to modular systems with common elements.



Leonardo-Finmeccanica GVA mission system selected for Danish Army vehicle fleet

Most mission systems will include Leonardo’s Drivers Night Vision System (DNVS4), which offers both daylight colour and thermal images to enable the driver and crew of the vehicle to operate safely and in confidence both day and night and in all weather conditions. In addition to DNVS4 and the display screens Leonardo is also providing the Citadel Panoramic and Compact cameras from its partner, Copenhagen Sensor Technologies.



DNVS (Drivers Night Vision System)



Citadel Panoramic

Bild


Citadel Compact

Bild
_______________________________

Denmark-Ballerup: Navigational instruments

2016/S 170-306484

Prior information notice for contracts in the field of defence and security

Supplies


II.4) Short description of nature and scope of works or nature and quantity or value of supplies or services:

The Danish Defence Acquisition and Logistics Organization (hereinafter referred to as DALO) plans to invite tenders for a Framework Agreement regarding acquisition of a 3D Inertial System (INS) for vehicles and is therefore looking for information on how to structure a possible future tender.

The purpose of this request for information (RFI) is to understand how the best possible tender can be arranged both for DALO and the suppliers according to EC regulation. It should be stressed that this notice is not a call for tenders and participation in the discussions will not be required for later participation.

By a 3D Inertial System, DALO understands a system which is mounted on a vehicle and primarily will be able to provide Position, Navigation and Timing information (PNT) in close connection with a Military GPS (MIL GPS). The INS shall improve the PNT coming from the GPS and the GPS shall stabilize the PNT data from the INS. In circumstances where the GPS signals are denied, the INS shall be able to give the vehicle PNT at a certain time.

As part of the preparation DALO would like to invite potential contractors to a discussion for the purpose of gathering information to be used for the preparation of future tender documents. DALO is conducting the discussion/market survey via Mercell Sourcing Services (http://permalink.mercell.com/61088708.aspx). DALO does currently not plan to arrange subsequent technical dialogue meetings with participants. However, based on the information obtained from the RFI, DALO reserves the right to do so if further insight into the information obtained via the RFI questionnaire is deemed desirable. DALO furthermore reserves the right to ask participants to elaborate on the answers provided in the RFI.

For instructions regarding access to documents and practicalities in relation to the technical dialogue / market survey, please see section VI.2).


theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Neue Mannschaftstransportpanzer für Dänemark

Beitrag von theoderich » 13. Sep 2016, 15:44

Bild


Aftale på Forsvarsområdet 2013-2017

Stående bataljonskampgrupper

Hærens nuværende seks kampbataljoner omstruktureres til tre større stående bataljonskampgrupper, der har evnen til at øge til styrkeproduktionen, og dermed har evnen til at understøtte et længerevarende engagement med et større bidrag – eksempelvis en bataljonskampgruppe.

Én stående bataljonskampgruppe vil være på højt beredskab. Beredskabet vil situationsbestemt blive tilpasset. Kampgruppen – eller dele af den – kan således med kort varsel udsendes som et egentligt landmilitært bidrag eller som et bidrag til en task force til bl.a. humanitære indsættelser.


theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Neue Mannschaftstransportpanzer für Dänemark

Beitrag von theoderich » 28. Sep 2016, 15:29

Denmark-Ballerup: Weapons, ammunition and associated parts

2016/S 187-336410

Prior information notice for contracts in the field of defence and security

Supplies


II.4) Short description of nature and scope of works or nature and quantity or value of supplies or services:

Market survey.

The Danish Defence Acquisition and Logistics Organization (hereinafter referred to as DALO) plans to tender a contract (Framework Agreement) regarding acquisition of a Smoke Grenade Launcher System (GLS) including sustainment agreement covering spare parts and technical support. DALO is therefore looking for information on how to structure a possible future tender.

The purpose of this request for information (RFI) is to understand how the best possible tender can be arranged both for DALO and suppliers, and according to the EC regulation. DALO is looking for information in order to develop a future Requirements Specification in accordance with existing products.

It should be stressed that this notice is not a call for tenders.

This notice is not a call for pre-qualification applications, and participation in the discussions will not be required for prequalification in the coming call for tenders. It should furthermore be stressed that replies given during the period of discussions will not in any way be part of any later assessment.

The purpose of this RFI is solely to give DALO wide background knowledge about the possibilities and challenges in the market.

By GLS DALO understands a complete manually and/or automatic operated technical system for protection and camouflage, functioning by screening the enemy's tracking ability of the vehicle in both the visual and infra red spectrum.

Additionally the system can be used as a less lethal weapon in relation to riots control.

GLS is an independent weapon system and must be integrated and tested as such, and especially according to applicable safety codes and standards.

The GLS is also defined as an integrated part of the vehicles accumulated protection, and designed for the vehicles within the Danish Defence, to solve tactical assignments in full spectrum.

The scope of supply includes, but is not limited to, the following items (in non-prioritized order):

    — Wiring, including prototype and EMC test,

    — Tubes, single or module,

    — control box,

    — Spare parts,

    — Courses/training for users and technicians,

    — Documentation,

    — Special tools and test equipment,

    — Service and support,

    — Provide support to a System Integrator for integration of the GLS on vehicles, weapon stations and ring mounts,

As part of the preparation DALO may invite potential contractors to a discussion for the purpose of gathering information to be used for the preparation of future tender documentation.

DALO is conducting the discussions/market survey via Mercell Sourcing Services




Die Dänen kleckern nicht gerade, was die Ausstattung ihrer gepanzerten Fahrzeuge betrifft: fernbedienbare Waffenstationen, schwere Granatwerfer, Schützendetektionssysteme, Laserwarnsysteme, 360°-Rundumsichtsysteme, Rauchkörperwerfer, ...

theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Neue Mannschaftstransportpanzer für Dänemark

Beitrag von theoderich » 01. Dez 2016, 10:22

Status på anskaffelsen af Piranha 5

Bild

Fokus er i øjeblikket rettet mod at færdiggøre designet af infanteriudgaven og herunder sikre integration af det såkaldte Government Furnished Ecquipment (GFE, som omfatter ECM, radioer, røgkastere mm.).

Hæren støttede MOWAG og Forsvarsministeriets Materiel- og Indkøbsstyrelse

En såkaldt Wood Mock-Up session er gennemført i uge 44, hvor GFE og al udrustning samt alle de mange skærme, håndtag, betjeningspaneler mv. er blevet diskuteret og placeret mest hensigtsmæssigt - både udenpå og indeni Piranha 5 i en træmodel som vist på billedet herunder.

Repræsentanter fra blandt andet Hærstaben, Hærens Kamp- og Ildstøttecenter og Telegrafregimentet støttede ingeniører og eksperter fra MOWAG og Forsvarsministeriets Materiel- og Indkøbsstyrelse (FMI) ved gennemførelse af den vigtige øvelse. Arbejdet på Wood Mock-Up-modellen danner grundlaget for opbygning af en præ-serie, og den er utrolig givtig. Der planlægges et tilsvarende arbejde med alle varianter af Piranha 5.

I uge 48 gennemføres en såkaldt Critical Design Review, hvorved FMI har et udgangspunkt for de køretøjer, der skal igennem omfattende tests i løbet af 2017.

Første Piranha 5 er på samlebåndet

De næste trin er færdiggørelse af infanterivarianten og opstart af designfasen af ingeniørvarianten efterfulgt af kommandostationsvarianten. På fabrikken i Kreuzlingen i Schweiz er MOWAG langt fremme med at etablere produktionslinjen. Svejserobotter er færdigprogrammeret og der er nu 18 skrog under opbygning i forskellige stadier. De to første Piranha 5 befinder sig på den såkaldte "assembly line", hvor kabling, motor mv. monteres. De øvrige skrog er i færd med at blive svejset og malet.

Kommende tests af Piranha 5

2017 bliver et meget travlt år med flere testfaser. Dels vil MOWAG selv gennemføre en omfattende test af Piranha 5, og dertil vil projektet gennemføre en klimatest (HOT) i USA i august 2017, en såkaldt Verification Acceptance Test (VAT) i september til oktober 2017 og en brugertest i november til december 2017. Endeligt foretages en klimatest (COLD) primo 2018.


The focus is currently on completing the design of the infantry variant, including ensuring the integration of the so-called Government Furnished Ecquipment (GFE, which includes ECM, radios, smoke launchers, etc.).

The Army supports MOWAG and Forsvarsministeriets Materiel- og Indkøbsstyrelse

A so-called Wood Mock-Up session was completed in week 44, where GFE and all the equipment as well as all the many screens, handles, control panels, etc. have been discussed and placed most appropriately - both outside and inside Piranha 5 in a wooden model as shown in the picture below.

Representatives from, among others, Hærstaben, Hærens Kamp- og Ildstøttecenter and the Telegrafregimentet, supported the engineers and experts from MOWAG and Forsvarsministeriets Materiel- og Indkøbsstyrelse (FMI) by carrying out the important exercise. The work on the Wood Mock-Up model forms the basis for building the pre-series, and it's incredibly beneficial. A similar work is planned for all variants of Piranha 5.

In week 48, a so-called Critical Design Review is implemented, by which FMI has a starting point for those vehicles that are going through extensive tests during 2017.

The first Piranha 5 is on the assembly line

The next steps are completion of the infantry variant and start of the design phase of the engineering variant, followed by the command variant. At the factory in Kreuzlingen in Switzerland, MOWAG is far ahead with establishing the production line. Welding robots are pre-programmed and there are now 18 hulls under construction in different stages. The first two Piranha 5 are on the so-called "assembly line", where wiring, motor, etc. are mounted. The other hulls are being welded and painted.

Upcoming tests of Piranha 5

2017 will be a very busy year with several test phases. In addition, MOWAG will carry out a comprehensive test of Piranha 5 and will also conduct a climate test (HOT) in the USA in August 2017, a so-called Verification Acceptance Test (VAT) from September to October 2017 and a user test from November to December 2017. Finally, a climate test (COLD) will be conducted in early 2018.




Ich habe außerdem ein interessantes Dokument zum Vertrag zwischen dem dänischen Verteidigungsministerium und GDELS Mowag gefunden (Mit den Beschaffungs- und den voraussichtlichen Life-Cycle-Costs der 309 Radpanzer.):

Zuletzt geändert von theoderich am 18. Mai 2017, 14:16, insgesamt 1-mal geändert.

theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Neue Mannschaftstransportpanzer für Dänemark

Beitrag von theoderich » 11. Feb 2017, 21:14

Denmark-Copenhagen: Intercom equipment

2017/S 029-052914

Contract award notice for contracts in the field of defence and security

Supplies


II.1.4) Short description of the contract or purchase(s):

The Danish Defence and Logistic Organization (DALO) has entered a framework agreement to sustain their existing intercom solution. This system consists of the Thales produced vehicle intercom system called SOTAS.

The agreement includes acquisition of components, related equipment and subsequent related services.

The previous framework agreement with Thales expired September 2015. The SOTAS and related equipment bought under this framework agreement shall be integrated with the existing intercom solution.

The duration of the framework agreement is set to be 7 years.

II.2.1) Total final value of contract(s)

Value: 131 000 000 DKK
Excluding VAT

V.1) Date of contract award decision:

6.2.2017

V.3) Name and address of economic operator in favour of whom the contract award decision has been taken

Thales Nederland B.V.
Bestevaer 46
1271 ZA Huizen
Netherlands



SOTAS Product Family

Bild

theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Neue Mannschaftstransportpanzer für Dänemark

Beitrag von theoderich » 28. Feb 2017, 06:49

Das Hærens Kamp- og ildstøttecenter hat den künftigen Orgplan für die Panzergrenadierkompanien (je 5 Piranha 5) und Infanteriekompanien (je 18 Piranha 5) veröffentlicht:

Bild
Zuletzt geändert von theoderich am 18. Mai 2017, 15:13, insgesamt 1-mal geändert.

theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Neue Mannschaftstransportpanzer für Dänemark

Beitrag von theoderich » 09. Mär 2017, 06:55

Regimentschefen, Februar 2017 hat geschrieben:Implementering af HTK ved Trænregimentet

HTK er en sammenkobling af GPS og radioer, der registrerer køretøjets position. Det giver førere, lige fra bataljonsstabe til delingsførere, mulighed for at følge kampen, føre mere effektivt og undgå, at allierede enheder beskyder hinanden.

I 2019 skal Hæren stille enheder til JEF beredskabet. Målsætningen er, at alle enheder til beredskabet skal anvende HTK i taktiske køretøjer og kommandostationer.

HTK indbygningen har fået højeste prioritet af Hærstaben, højere end beredskabsopgaver. Det kommer alle operative soldater til at kunne mærke, fordi køretøjer skal afgives til indbygning. Det medfører, at vi i en periode vil mangle flere køretøjer til uddannelse end nu.

Til gengæld vil vi bagefter have et system, der gør, at vi fremover vil kunne reagere hurtigere, mere sikkert og mere præcist på øvelser og under udsendelser.

Regimentet arbejder på at planlægge afgivelserne, så de påvirker uddannelsen af stående styrke mindst muligt.

Planen for indbygning af HTK ved Trænregimentet er:

2017:

Indbygning af HTK i Eagle 4 og i kommandostationscontainere.

2017 - 2018:

Indbygning af HTK i MAN HX/SX, Bjærgningsvogn Miller og ti Piranha 3 ambulancer.

2018 – 2022:

Tilgang af 37 klargjorte Piranha 4, hvoraf 26 vil have indbygget HTK.


Implementation of HTK by Trænregimentet

HTK is a link between GPS and radios, which records the position of the vehicle. It gives drivers from bataillon staff to unit drivers the opportunity to watch the battle, lead more effectively and avoid allied units to shoot at each other.

In 2019, the Army shall provide units for JEF preparedness. The objective is that all prepared units must use HTK in tactical vehicles and command stations.

HTK installation has been given top priority by Hærstaben, higher than preparedness tasks. It comes that all operational soldiers should be marked, because vehicles have to be submitted for installation. This means that, compared to now, over a period there will be missing several vehicles for education.

In return, afterwards we will have a system, which means that we will be able to respond more quickly, more safely and more precisely on exercises and during broadcasts.

The regiment is working on scheduling the Releases, as they should the least possible affect the education of standing forces.

The plan for the installation of HTK by Regiment is:

2017

Installation of HTK in Eagle 4 and command station containers.

2017 - 2018:

Installation of HTK in MAN HX/SX, Recovery Trucks Miller and ten Piranha 3 ambulances.

2018 - 2022:

Addition of 37 ready Piranha 4, 26 of which will have built-in HTK.


    http://www2.forsvaret.dk/omos/organisation/haeren/organisation/traenregimentet/Documents/Vægavis/Vægavis%20FEB%20LOG.pdf


SOTAS Product Family



Harris Enhanced High Capacity Data Radio (EnHCDR™)



Harris Falcon III® RF-7800S SPR™ Team Radio Secure Personal Team Radio



Defense Advanced GPS Receiver (DAGR)



Explosion Resistant GPS Receiver (ERGR)



SITAWARE C4I SUITE

Zuletzt geändert von theoderich am 18. Mai 2017, 12:57, insgesamt 1-mal geändert.

theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Neue Mannschaftstransportpanzer für Dänemark

Beitrag von theoderich » 10. Mär 2017, 15:59

NYT ARTILLERI OG TUNGE MORTERER (HKIC Nyhedsbrev, NR. 02 / 3. ÅRGANG, NOV 2016)

Samtidig med anskaffelsen af artillerisystemer er Hæren også langt fremme i processen med at anskaffe nye autonome 120 mm mortersystemer, der skal indbygges i Piranha 5. Der forventes anskaffet 15 mortersystemer.

I dette projekt er der kun to tilbudsgivere tilbage: RUAG byder ind med Cobra, der også er solgt til den svejtsiske hær. Det andet system er Cardom 10 fra Elbit, der er en videreudvikling af den Cardom, der kendes fra den israelske hær og fra US Stryker Brigaden. Begge systemer er fuldt autonome og er dermed ikke afhængige af indmålning ved stillingsindtagelse, men kan ”shoot and scoot” i samme høje tempo som artilleripjecerne - måske endda hurtigere.

Der gennemføres verifikationstest og evaluering ultimo 2016, ligesom anbefalingen fra FMI forventes at ligge klar til politisk afgørelse inden årsskiftet. Dette med håbet om, at der kan indgås kontrakt i marts 2017.

Om alt går vel, modtager vi nye artillerisystemer i 2019 og 120 mm mortersystemer i 2020.



CARDOM



COBRA


Bild

Bild
Zuletzt geändert von theoderich am 15. Mär 2017, 01:13, insgesamt 1-mal geändert.

theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Neue Mannschaftstransportpanzer für Dänemark

Beitrag von theoderich » 15. Mär 2017, 00:03

Ein österreichisches Unternehmen ist seit heute an den neuen "Piranha V" für Dänemark beteiligt :-)

Auftragswert: umgerechnet 14,39 Mio. EUR!

    Typevalg af 120 mm mortersystem er godkendt

    Bild

    Anskaffelsen omfatter 15 stk. 120 mm mortersystemer – med option på yderligere 6 systemer mere til en kontraktpris på 107 mio. kr. Mortersystemerne skal indbygges i Forsvarets kommende pansrede mandskabsvogn Piranha 5. Dertil kommer skydeledelsesmodul, reservedelspakke, dokumentation, uddannelse, ammunitionsreoler til minimum 40 granater og teknisk støtte til Piranha 5 leverandøren.

    Mortersystemet er af typen CARDOM 10, som leveres af østrigske ESLAIT og mortersystermerne forventes, at blive leveret i perioden 2018-19.


    Typenwahl des 120 mm Granatwerfersystems wird genehmigt

    Die Parteien hinter der Verteidigungsvorlage haben auf ihrem Treffen vom 14. März beschlossen, den Vorschlag des FMI zur Typenwahl des Granatwerfersystems zu genehmigen.

    Der Ankauf umfasst 15 Stk. 120 mm Granatwerfersysteme - mit der Option für weitere 6 Systeme zum Preis von 107 Mio. Kr. Das Granatwerfersystem soll in den künftigen Mannschaftstransportpanzer der Streitkräfte, Piranha 5, eingebaut werden. Dazu kommen ein Feuerleitmodul, Ersatzteilpaket, Dokumentation, Ausbildung, Munitionsregale für mindestens 40 Granaten und technische Unterstützung für den Lieferanten des Piranha 5.

    Das Granatwerfersystem ist vom Typ CARDOM 10, welches von der österreichischen ESLAIT zur Verfügung gestellt, und voraussichtlich im Zeitraum 2018-19 geliefert wird. Wie auch im Fall des neuen Artilleriesystems ist die Entscheidung zur Investition in ein neues Granatwerfersystem im Zusammenhang mit dem Mangel des Heeres an mobiler und schnell einsetzbarer Feuerunterstützung zu sehen. Sowohl das Granatwerfersystem als auch das Artilleriesystem werden diesen Kapazitätmangel im Heer beheben.



    Udbudsprocessen

    Udbuddet blev opstartet i april/maj 2015 med en markedsundersøgelse og i foråret 2016 blev fire producenter prækvalificeret til at byde på projektet. De fire producenter var STK fra Singapore, ESLAIT fra Østrig, RUAG fra Schweiz og TDA fra Frankrig.

    Ved første tilbudsrunde i september 2016 modtog FMI tilbud fra schweiziske RUAG med COBRA systemet og østrigske ESLAIT med CARDOM 10.

    STK og TDA valgte ikke at komme med bud.

    Typevalg

    Efter en evaluering af første tilbudsrunde blev de to systemer testet over to dage inklusiv skarpskydning. Der viste det sig at kun CARDOM 10 kunne leve op til de operative og tekniske krav. Efter en forhandlingsrunde afgav ESLAIT andet tilbud, der i december 2016 herefter blev ophøjet til det endelige tilbud. Det er ikke første gang, at CARDOM systemet skal indbygges i Piranha, idet den i dag er indbygget i f.eks. STRYKER (Piranha 3).


    Ausschreibung

    Die Ausschreibung begann im April/Mai 2015 mit einer Marktuntersuchung und im Frühjahr 2016 wurden vier Hersteller vorausgewählt, um für das Projekt zu bieten. Die vier Hersteller waren STK aus Singapur, ESLAIT aus Österreich, RUAG aus der Schweiz und TDA aus Frankreich.

    In der ersten Bieterrunde im September 2016 erhielt FMI Angebote von der Schweizer RUAG mit dem System COBRA und der österreichischen ESLAIT mit CARDOM 10.

    STK und TDA entschieden sich, kein Angebot zu legen.

    Typenwahl

    Nach einer Evaluierung der ersten Bieterrunde wurden die zwei Systeme zwei Tage lang getestet, inklusive Scharfschießen. Es ergab sich, dass nur CARDOM 10 die operativen und technischen Anforderungen erfüllen konnte. Nach Gesprächen lieferte ESLAIT andere Angebote, die im Dezember 2016 zu einem Endangebot führten. Das ist nicht das erste Mal, dass CARDOM in den Piranha eingebaut wird, nachdem es dzt. u.a. in STRYKER (Piranha 3) integriert ist.


    Om anskaffelsen

      Anskaffelsen indeholder selve mortéren, semiautomatisk ladesystem og skydeledelsessystem

      Ammunitionsreoler og initial reservedelspakning

      Kan anvende eksisterende ammunitionsarv

      Teknisk støtte til indbygning i ny pansret mandskabsvogn (Piranha 5) og serviceaftale over 30 år


    Über die Beschaffung

      Die Beschaffung beinhaltet den Granatwerfer, das halbautomatische Ladesystem und das Feuerleitsystem

      Munitionskästen und ein erstes Ersatzteilpaket

      Kann existierenden Munitionsbestand nutzen

      Technische Unterstützung zum Einbau in den neuen Mannschaftstransportpanzer (Piranha 5) und logistische Unterstützung über 30 Jahre



    Nyt materiel til Forsvaret



    Bild

    Bild

theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Neue Mannschaftstransportpanzer für Dänemark

Beitrag von theoderich » 18. Mai 2017, 12:15

First Serial PIRANHA 5 Handed Over to Denmark

Bild

Bild

Bild

Bild

During an official ceremony at the company’s facilities in Kreuzlingen, Switzerland, held on 17 May 2017, General Dynamics European Land Systems-Mowag (GDELS-Mowag) handed over the first serial PIRANHA 5 (8x8) wheeled vehicle to the Danish Army.

The main deliveries are scheduled to last until 2023. By the end of 2017, GDELS-Mowag will deliver four vehicles in total. Danish PIRANHA 5s will be firstly send to the US for testing in harsh desert conditions (trials planned for summer 2017). In late 2017, the vehicles will be send either to Finland or Norway for trials in winter conditions.

During an official ceremony it was confirmed by the Danish Army that the first PIRANHA 5s will join operational service starting from 2018 and 2019. It is planned that a first batch will be composed of 14-15 vehicles in two variants: Infantry carrier and command post. In early 2019, the Danish Army wants to get all remaining versions expect a mobile 120mm mortar. This variant is planned for fielding in late 2019.



GDELS MOWAG verwendet in der Fertigungsstraße für den "Piranha 5" offensichtlich österreichische Schweißroboter:

_____________________________

Aktstykke nr. 69

Forsvarsministeriet. København, den 5. april 2017.


Forsvarsministeriet anmoder hermed om Finansudvalgets tilslutning til at anvende op til 99,0 mio. kr. i perioden 2017 – 2019 til anskaffelse af 15 stk. 120 mm tunge mortersystemer med henblik på indbygning i 15 af forsvarets nye pansrede mandskabsvogne af typen Piranha 5.

Zuletzt geändert von theoderich am 23. Jun 2017, 02:11, insgesamt 1-mal geändert.

theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Neue Mannschaftstransportpanzer für Dänemark

Beitrag von theoderich » 19. Mai 2017, 17:10

General Dynamics European Land Systems handover the first PIRANHA Wheeled Armoured Vehicle to Denmark

Bild

Bild

Bild
Zuletzt geändert von theoderich am 07. Jun 2017, 14:39, insgesamt 1-mal geändert.

Antworten
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable