Hinweis: Sie befinden sich im Archiv des alten Forums von DOPPELADLER.COM. Dieses Forum wird nicht länger betrieben. Es ist nur mehr Lesezugriff möglich.
Sie erreichen das DOPPELADLER.COM FORUM nun unter ...

https://www.doppeladler.com/da/forum/index.php



Polen präsentiert Beschaffungsplan 2013-2022

Wehrtechnik & Rüstung, Gemeinsame Außen- und Sicherheitspolitik
theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Polen präsentiert Beschaffungsplan 2013-2022

Beitrag von theoderich » 05. Jan 2016, 19:20

Rak and Homar Agreements In 2016. Modernization Of The Polish Artillery Systems To Be Delayed

Currently, it is planned that negotiations covering the procurement of the selected parts of the division-level elements, consisting of the “HOMAR” multiple rocket launch systems are going to begin on 18th January 2016. Selection of a foreign partner is going to be finalized once the negotiations are started, and once the consortium submits its initial offer.

Huta Stalowa Wola [Stalowa Wola Ironworks], acts as the leader of the consortium which realizes the Homar programme. The agreement covering the procurement of the selected elements of the Homar module is planned to be concluded in 2016. The initial deliveries, on the other hand, are scheduled to take place in 2018.

General Adam Duda, at the end of September this year, informed us that two offers submitted by the foreign partners are being analysed, one coming from the United States (HIMARS system with GMLRS and ATACMS rockets), and one from Israel (probably the LORA and EXTRA projectiles) As a result of the Homar programme, the Armed Forces would be now capable of destroying targets at distances of up to 300 kilometres, with the use of the rocket artillery.

On the other hand, conclusion of the agreement, the aim of which is to acquire company-level elements using the Rak self-propelled mortars, is planned to happen during the second quarter of 2016. Earlier on, during the 1st quarter of the year, a procedure should be started, the purpose of which is going to be acquire the system, once the qualification test programme is finalized.

According to the statement made by Ossolinska, it is planned to acquire eight company-level Rak mortar modules, which – most probably, will become the equipment for the battalions that have the Rosomak APCs at their disposal. The initial deliveries of the Rak systems for the Polish Army are scheduled to begin in 2017.


theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Polen präsentiert Beschaffungsplan 2013-2022

Beitrag von theoderich » 02. Jul 2016, 12:09

Polish Army: Lack of Modernization Funds. Kownacki: “No chances of implementation, considering the current GDP”

Bartosz Kownacki, Secretary of State at the Polish Ministry of Defence once again expressed his doubts related to the technological army modernization plan developed by the former government. As it was stated by the Deputy Minister in his interview for “Rzeczpospolita”, the programme is overestimated, and thus no chances exist to implement it fully, considering the current GDP.

As it was indicated by Kownacki, implementation of the modernization programme, pertaining solely to the most urgent and “simplest” of its elements, such as the sections related to the attack helicopters and medium range “Wisła” air defence systems, would lead to a complete drainage of funds. This means that the Ministry would not have sufficient funds to finance the Krab, Rak or Narew programmes, with the Narew SHORAD system expected to be realized domestically to as large extent as possible.

“We assumed that PLN 32 billion is a sum which we may spend throughout the upcoming three years. After we calculated the level of the other spending elements, we would have only PLN 15 billion left for modernization” - as it was stated by Kownacki in Rzeczpospolita daily.

In case of redefinition of the modernization plan, three factors are going to be taken into consideration, including the budgetary options, replacement of the old equipment and interests of the domestic industry. As it was noted by Kownacki, the above is not tantamount to cuts. The whole modernization programme, consisting of around 800 items, will not suffer from them. We do not know though, when the Ministry is going to be able to make any relevant decisions, since currently analytical-concept phase is in progress, preceding the negotiation stage. Prospective thinking is, as Kownacki stated, also quite a significant problem. Here, the official referred to the case of Rosomak APC which, in several years, will have to be replaced with a new platform. However, as Kownacki noted, nobody in Poland even thinks about this.


theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Polen präsentiert Beschaffungsplan 2013-2022

Beitrag von theoderich » 22. Nov 2016, 06:44

Krab Howitzers for the Polish Army

During his visit at the Huta Stalowa Wola S.A. facility, Polish Defence Minister Antoni Macierewicz confirmed the fact that Polish Ministry of Defence and HSW S.A. finally agreed upon the content of the agreement which is going to constitute the most significant armament procurement contract concluded by the new government. As we have found out, the latest arrangements were made on the eve of the Ministerial visit at the Stalowa Wola facility. The contract shall include four squadron sized elements of the “Regina” system, equipped with, among other units, 96 Krab self-propelled howitzers.

The agreement is to be concluded immediately after all of the legally required formal procedures are finalized at the Armament Inspectorate and at the Polish Ministry of Defence.

Minister Macierewicz disclosed the fact that the value of the arranged and initiated, in a form of a protocol, agreement, regarding the procurement of equipment for another four units, also referred to as “Regina”, clearly “exceeds PLN 4 billion”. The delivery deadline for the individual units has not been officially disclosed, however, Defence24.pl was able to determine that the final artillery squadron is to equipped with “Krabs” and the accompanying vehicles, by the year 2024.

In Stalowa Wola, on the day of the visit (besides the two cannons handed off to the army at the end of April), 16 assembled “Krab” platforms were present, 9 of which already went through the final acceptance tests process, and which remain at the disposal of the army. Subsequent howitzers are undergoing a test programme, or have already went through the tests, and are awaiting for the final paint works. Besides that, complete turret systems for the remaining cannons have already been gathered at HSW, along with “Krab” SPHs of the 2012 delivery, waiting for their chassis to be replaced. Beyond the scope of chassis replacement, the aforesaid howitzers will also undergo a complete turret overhaul, before the said turrets are placed onto the new carriers. All of the examples of the chassis for the first squadron “fire module” will be delivered by the Koreans by the end of this year.



Armatohaubice dla WP

Bild

Bild

Bild

Bild

Bild

Bild

Bild

Bild

Bild

Bild

Bild

Bild

theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Polen präsentiert Beschaffungsplan 2013-2022

Beitrag von theoderich » 24. Dez 2016, 11:39

Umowa na dostawę dmo – REGINA

Bild


Poland orders four Regina artillery squadrons from HSW

Worth PLN4.65 billion (USD1.1 billion) and signed on 14 December, the contract includes the delivery of 96 Krab 155 mm self-propelled howitzers (SPHs), 12 command staff vehicles, 32 command post vehicles, 24 ammunition supply vehicles, and 4 mobile armament and electronics workshop vehicles.

Together with a PLN968 million order placed in April for 96 M120K Rak self-propelled mortars and 32 command vehicles, Poland has now spent PLN5.7 billion on artillery systems this year alone.

The four squadrons (Dywizjonowy Modul Ogniowy: DMO), are due for delivery between 2018 and 2024. A single DMO includes 24 Krabs, three command staff vehicles, eight command post vehicles, six ammunition supply vehicles, and one mobile armament and electronics workshop vehicle.

The Krab SPH is a Polish-modified amalgam of the following international designs: the South Korean Hanwha Techwin K9 Thunder chassis, the British BAE Systems AS90 Braveheart turret, and a German L52 155 mm artillery piece.


theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Polen präsentiert Beschaffungsplan 2013-2022

Beitrag von theoderich » 03. Feb 2017, 15:20

Bild

Bild

Bild

Bild

Bild

Bild

Huta Stalowa Wola has accelerated the work on the 155 mm “Kryl” self-propelled howitzer, based on a wheeled platform. Polish Armed Forces have declared that, following the introduction of the “Krab” howitzer, “Kryl” is going to become yet another artillery system, which will make it possible to fully replace the “Gvozdikas” and “Danas”. The manufacturer declares that production readiness may be attained as early as in 2018, however, in order to achieve that, it is highly desirable to define the requirements and carry out a number of formal procedures.

The fact that the programme concerning the wheeled 155 mm SPH is yet again becoming important for the Army has been confirmed by Antoni Macierewicz, Minister of Defence.

“The army has already rekindled its interest in that project.The work will commence” - as it was stated by Antoni Macierewicz, on 18th November 2016, during a press conference finalizing his visit at Huta Stalowa Wola.

The aforesaid declaration was made several days after the Minister had signed the new, updated technical modernization plan, formally crossing out the wheeled SPH programme out of the list.

Currently the relevant documentation is being prepared. Updating, supplementing and submitting of the said documents at the Armament Inspectorate is a matter of couple of months. So far, the situation is as follows: since more than 2 years the vehicle has been operable, it is drivable, it shoots, it carries out all of the tasks it was designed to carry out, but still, the military test programme remains impossible to be passed due to procedural reasons. Without confirmed tactical and technical requirements, continuation of the costly research is quite cost-inducing for the manufacturer. The Polish Ministry of Defence could disapprove the research results, on the grounds of the fact that no formal basis for that exists. This is also a hampering factor, making it more difficult to export the “Kryl” howitzer, since this type of armament is quite desirable on the foreign markets.


theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Polen präsentiert Beschaffungsplan 2013-2022

Beitrag von theoderich » 18. Mär 2017, 11:07


theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Polen präsentiert Beschaffungsplan 2013-2022

Beitrag von theoderich » 09. Jul 2017, 08:29

Komunikat MON

4 lipca br. konsorcjum, którego liderem jest Polska Grupa Zbrojeniowa S.A., zarekomendowało amerykański koncern obronny Lockheed Martin do dalszych rozmów w realizacji programu dywizjonowego modułu ogniowego wieloprowadnicowych wyrzutni rakietowych (DMO WWR) „Homar”.


On July 4th the consortium, led by Polska Grupa Zbrojeniowa S.A., recommended to continue discussions with the American company Lockheed Martin on the implementation of the multiple rocket launcher (DMO WWR) "Homar".


Bild

theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Polen präsentiert Beschaffungsplan 2013-2022

Beitrag von theoderich » 04. Aug 2017, 15:49

First Polish Army unit receives full complement of Krab SPHs

Deliveries of Krab 155 mm self-propelled howitzers (SPHs) to the Masurian Artillery Regiment (11 MPA) will be completed this month, marked by a ceremony on 31 August in the presence of officials from the ministry of defence, the unit said on its website. Fourteen Krabs were delivered to the regiment by tank transporters on 31 July.

The 11 MPA will be the first of four squadrons (Dywizjonowy Modul Ogniowy: DMO) to receive its full complement of the Krab. Each DMO comprises 24 Krabs, three command staff vehicles, eight command post vehicles, six ammunition supply vehicles, and one mobile armament and electronics workshop vehicle.


11 Mazurski Pulk Artylerii


Bild

Bild

Bild

theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Polen präsentiert Beschaffungsplan 2013-2022

Beitrag von theoderich » 07. Sep 2017, 18:07


theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Polen präsentiert Beschaffungsplan 2013-2022

Beitrag von theoderich » 29. Nov 2017, 11:07

Poland – High Mobility Artillery Rocket System (HIMARS)

The State Department has made a determination approving a possible Foreign Military Sale to Poland for a High Mobility Artillery Rocket System (HIMARS) for an estimated cost of $250 million. The Defense Security Cooperation Agency delivered the required certification notifying Congress of this possible sale today.

The Government of Poland has requested to purchase

    sixteen (16) Guided Multiple Launch Rocket System (GMLRS) M31A1 Unitary,

    nine (9) Guided Multiple Launch Rocket System (GMLRS) M30A1 alternative warheads,

    sixty-one (61) Army Tactical Missile Systems (ATACMS) M57 Unitary.


Also included are

    eight (8) Universal Position Navigation Units (UPNU),

    thirty-four (34) Low Cost Reduced Range (LCRR) practice rockets,

    one thousand six hundred forty-two (1,642) Guidance and Control Section Assemblies for GMLRS,

    Missile Common Test Sets and Devices, testing Precision,

    Lightweight GPS Receivers (PLGR),

    support equipment,

    U.S. Government and contractor services, training, and other related elements of logistics and program support.

The estimated cost is $250 million.


theoderich
Beiträge: 20984
Registriert: 09. Sep 2008, 22:29
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable

Re: Polen präsentiert Beschaffungsplan 2013-2022

Beitrag von theoderich » 12. Dez 2017, 18:48

Poland to upgrade T-72 tanks and Dana SPHs

Jane’s has also learned about plans for wz. 77 Dana 8x8 wheeled 152 mm self-propelled howitzers (SPHs) to be upgraded in 2018–20.

Poland plans to retain the 152 mm gun instead of replacing it with a NATO standard 155 mm howitzer.

The main focus of the modernisation will be to upgrade the Tatra T-815 VT Kolos chassis and SPH gun recoil and electro-hydraulic elevation system to reduce the time needed between the first and last shot.


Antworten
[phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable